Intervention Fluids

Fluids for postdrilling well workover and intervention

Coiled tubing debris-removal fluid

Reduce risk of flow-assurance problems

Fluid offerings designed specifically for postdrilling wellbore intervention and workover are ideally suited for deepwater intervention, which carries distinctive flow-assurance risks that could threaten your investment.

Our intervention fluid systems include the POWERPRO CT coiled tubing debris-removal fluid that is engineered specifically for CT operations. The technology includes the POWERVIS linear biopolymer viscosifier that is engineered to minimize pressure loss and elevate low-shear-rate viscosities. Its unique rheological profile delivers lower pump pressures and equivalent circulating density. The system has demonstrated dramatic operating system pressure, even in ultraextended-reach drilling.

Further streamline debris removal by  integrating fluid, tools, and equipment

Our portfolio